Boehringer Ingelheim G144, Biberach an der Riss, Germany

From an urbanistic perspective the building marks the endpoint of the area's building development and also the endpoint of the alley that is the main axis of the factory premises.

— Riegler Riewe Architekten
Laboratory Building Boehringer Ingelheim G144, Biberach an der Riss, Germany

Laboratory Building Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

The depth of the building is a result of the inner organisation of the building's functions and the demand for attractive open areas providing an adequate work environment. Based on an optimized building outline that faciliates the organisation of the biggest departments per building level a building structure is generated that creates differently sized loggias in the building's outer shell and multi-level voids inside the building. Combined with staircases and corridors an open system of short cross-connections and spatially widening longitudinal connections is established which provide intervisibility either to the next lower or higher level insde the building or the exterior.

The compact structure, a cuboidal structure that – despite the extensive depth of the building – still allows an optimal amount of daylight to penetrate and develops based on how the functional sequences are organized internally and the demand for attractive, open spaces. The loggias of various sizes located on the outer shell and the multi-story air spaces in the interior, together with the axes and stairwells on each floor, create an open system of short cross-connections and elongated, longitudinal connections with a variety of view relationships.

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

The facades are constructed as non-load-bearing, prefabricated, composite elements with an outer surface of "artificial marble", which consisted of marble chips that have been crushed in water barrels to marble powder, which is then bound with white cement. The sun protection that is required for the structure is provided by the arrangement of external shading devices (horizontal blinds with rotating slats). Depending on how they are positioned, the blinds in the skylight area also redirect daylight. The ventilation of the individual rooms depends on the needs: All laboratory areas are air-conditioned, and ventilation though the windows is achieved in all offices.

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Boehringer Ingelheim G144, Biberach an der Riss, Germany

© Angelo Kaunat

Competition

2006, 1st Prize

Completion

2009

Project type

Laboratory / Office Building

Client

Boehringer Ingelheim Pharma GmbH & Co.KG

Architects

Riegler Riewe Architekten

Planning experts

Structural planning:
Gmeiner Haferl, Vienna

HVAC:
Rentschler und Riedesser, Filderstadt

Laboratory planning:
Dr. Heinekamp, Karlsfeld near Munich

Electrotechnical planning:
Müller & Bleher, Filderstadt

Building Physics:
Kurz und Fischer, Winnenden

Fire prevention:
TPG Lehmann, Berlin

Site supervision:
Stinner & Von der Oelsnitz, Stockach

Technical data

Cubature: 104.500 m³

Gross Floor area: 23.100 m²

Net Floor Area: 11.100 m²

Usable Area: 10.300 m²

Recommended Articles


Title Studio
Genius loci
Gerätturnhalle University of Potsdam, Germany Behzadi + Partner Architekten
Office building Berlin Adlershof, Germany Müller Reimann Architekten